Abstract

High voltage assets in substations, such as transformer and reactors, are crucial for the safe operation and continuity of the electric power supply. Consequently online monitoring systems have been used to increase the reliability and availability of those pieces of equipment, and at the same time, to reduce costs.  Eletrobras Eletrosul started to implement online monitoring in power transformers in 2001 with the Sigma system. This paper presents the deployment history of the Sigma monitoring system at Eletrosul Eletrobras, as well as its evolution along time, together with the outcomes and benefits brought by improvements in the system.

Authors

Eletrobras Eletrosul Cláudio Severino
Eletrobras Eletrosul Pedro Peroni
Eletrobras Eletrosul Francisco Zacarias Peroni
Eletrobras Eletrosul Giuliano Pereira
Treetech Sistemas Digitais Ltda. Marcos E. G. Alves
Treetech Sistemas Digitais Ltda. Luís Lopes

1.0 - INTRODUCTION

Substation high voltage equipment such as power transformer, shunt reactors, current transformers, capacitive voltage transformers, high voltage circuit breakers and disconnect switches are the production assets of the electric power generation plants, and as such are crucial for the safe operation and continuity of the electric power supply.  When operated under appropriate conditions and managed accurately, these assets become a major factor of operational and economic efficiency and competitiveness for the sector’s utilities.

In order to ensure greater reliability and availability of the equipment while cutting operating and maintenance costs, as well as increasing maintenance efficiency, the monitoring and diagnostic systems for online monitoring and diagnostic of the asset state have spread over the last decade, providing a tool for the migration from preventive to predictive maintenance and to a maintenance philosophy centered on reliability [1] [2].

Great emphasis has been given to power transformers and shunt reactors, since these are considered the main assets of a substation due to being essential for the generation and transmission of the electric power, and to having high replacement costs and requiring a long time to be manufactured. .

This paper presents a brief history of the deployment and evolution of these systems in Eletrobras Eletrosul and the results obtained.

2.0 - IMPLEMENTATION OF TRANSFORMER ONLINE MONITORING AT ELETROSUL

In the context above, and as a company which traditionally uses innovative technologies and is a benchmark for the best practices in asset management, Eletrobras Eletrosul started to implement in 2001 the online monitoring of power transformers, seeking to achieve the following general objectives:

  • Online diagnostics of the high voltage equipment state
  • Reduced risk of failure;
  • Service Life extension and control;
  • Migration to predictive maintenance:
  • Reduction of maintenance costs;
  • Increased equipment availability in the system;
  • Reduced costs due to equipment availability;
  • Optimized asset use;
  • Better insurance premium negotiation;
  • Preservation of the corporate image;

The deployment started by two 230/138 kV 150 MVA three-phase transformers at the Itajaí substation, with on-load tap changers [3] shown in Figure 1, where the Treetech Sigma system was installed, with a basic architecture like the one shown in Figure 2.

Fig. 1.  First monitored transformers at Itajaí substation, 138/13, 8 kV 150 MVA

Fig. 2.  Original architecture of the online monitoring system deployed in the Itajaí substation

The main features of this solution, shown in figure 2, are:

  • Use of a decentralized architecture, with IED sensors, eliminating the need of a centralized element (PLC or other) in the body of the transformer [4] [5];
  • IED-type sensors designed and tested specifically for the substation yard environment, ensuring the reliability and durability of the system [4] [5];
  • Communication between IED sensors and the RS485 monitoring server, shielded twisted pair physical medium;
  • Conversion of the communication medium RS485 to RS232 for connection to the monitoring server;
  • Use of an independent monitoring server in the control room of each substation;
  • Connection of the monitoring server to the Eletrosul corporate network (intranet) to allow users to have remote access to the monitoring system;
  • Installation of a remote viewing software on each remote user’s computer connected to the monitoring server.

Monitoried variables, according to Eletrosul’s technical specifications, are in Table 1 [3].

Variables monitored in Itajaí substation transformers as specified by Eletrosul

VariableSensor
Top oil temperatureTemperature Monitor
Winding temperature (hot spot)
Ambient temperature
Oil temperature at the OLTC load switch
Load percentage
Oil temperature at the bottom of the tankTemperature Monitor
Insulation CapacitanceBushing Monitor
Insulation Tangent Delta
Gases dissolved in the oilGas Monitor
Water content dissolved in the transformer oilMoisture Monitor
Water content dissolved in the OLTC oilMoisture Monitor
Membrane rupture / expansion tank bagMembrane/ bag rupture relay
Line voltagesDigital transducer
Line currents
Fan/pump voltagesDigital transducer
Fan/pump currents
OLTC voltagesDigital transducer
OLTC currents
OLTC tap positionTap position indicator
Cooling stages on / offData Acquisition Module
OLTC operation time
Alarm contacts:
- Buchholz relay,
- Pressure relief valve,
- Oil level, etc.

With these variables, the Sigma software performs data processing to obtain useful information for transformer condition diagnosis and prognosis. Engineering functions, made up of mathematical models and algorithms that peform data processing are shown in Table 2 [3].

Engineering Models for transformer condition diagnosis and prognosis

Engineering Model Diagnosis and Prognosis
Insulation service lifeRemaining Insulation service life
Insulation service life loss trend (% / day)
Remaining insulation service life (years)
Temperature final gradient forecast Future hot spot temperature after stabilization
Time to reach alarm temperature
Time to reach shutdown temperature
Gases dissolved in oilGas in oil evolution trend (mainly H 2)
Alarms per evolution trend and high or very high gas concentrations
Chromatography / PhysicochemicalGas chromatography offline test reports
Physicochemical offline test reports
Moisture in oil and on paperTransformer sealing - expansion tank rubber bag rupture
Water content in oil (ppm)
Trend in water content evolution (ppm / day)
Water content in paper (% dry mass)
Insulation service life loss acceleration factor through hydrolysis
Bubble formation temperature Bubble formation temperature
Free water formation temperature
Cooling efficiencyTop oil calculated temperature
Difference between measured and calculated temperatures
Cooling system efficiency
OLTC temperature differentialInstant temperature differential
Filtered temperature differential
Differential temperature high alarms
Torque and OLTC motor operation timeMaximum torque of the motor in each commutation region
OLTC mechanism operation time
Out-of-standard alarms per torque values and operation time
OLTC maintenance assistantCommuter operation number
Commuted current sum
OLTC operation time
Forecast of remaining time before the next OLTC maintenance
Early OLTC maintenance warnings
Forced ventilation maintenance wizard Ventilation group operation time, total and after the last maintenance.
Forecast of the remaining time before ventilation maintenance.
Early Ventilation maintenance warnings

Later, this same solution has expanded to 27 (twenty seven) other Eletrosul transformers and reactors. Table 3 lists all monitored pieces of equipment.

Sigma monitoring systems installed at Eletrosul

SubstationTransformersReactorsVoltage (kV)Power
Itajaí30230/138 - 13,8150MVA
Siderópolis10230/69 - 13,888MVA
Xanxerê20230/138 - 13,8150MVA
Campos Novos60525/230 - 13,8224MVA
Biguaçu20230/138 - 13,8150MVA
Gravataí III40230/69 - 13,855MVA
Nova Santa Rita30525/230 - 13,8224MVA
Santo Ângelo33525/230 - 13,8
550 (reactor)
224MVA
54MVAr
Dourados10230/138 - 13,875MVA

3.0 - EVOLUTION OF ONLINE MONITORING SYSTEMS

Naturally, because at the time of the early implementation (2001), this was a new technology, the Sigma system underwent a process of evolution in which Eletrobras Eletrosul played an important role in interacting with new developments, enhancements and customizations performed in the system.

In this process the system was customized to meet Eletrobras’s specific needs, like the inclusion of a proprietary diagnostic algorithm through gas chromatography as well as improvements to facilitate the usability of the system. The following are some system evolution examples:

3.1 - Customizing a method for DGA diagnosis for Eletrosul

The analysis of gas chromatography test results takes place at Eletrosul through a proprietary methodology developed as a result of the company’s experience with this technique. Due to the fact the monitoring software is open it allows the addition of new monitoring functions by the user, which was done with this Eletrosul proprietary gas-chromatography technique.

3.2 - System expansions

Taking advantage of the characteristics of modularity and expandability of the Sigma system, and of the fact that it is an open system, expansions have been included to add other sensors.

IED sensors were initially added to the system to perform online monitoring of bushing capacitance and tangent delta since those sensors were installed on the transformer in a posterior step.

Later, several online sensors were added to the system to detect gas dissolved in oil (primarily H2); those sensors were already installed in the Eletrosul transformer park. In this case, the fact that the system is open to the development of a specific communication driver for those sensors, which used a factory proprietary communication protocol, was also an advantage. Since the sensors were in other company substations, we used the Eletrosul Intranet to send data from these sensors to the monitoring server in the Itajaí substation control room.

3.3 - Sending e-mail alerts

To eliminate the need for an operator to continually oversee the system, an e-mail capability was added to the system so messages are automatically sent to previously registered addresses. This prevents wasting the maintenance engineers’ time during periods in which no problems are diagnosed.

3.4 - Upgrading with Web 2.0 technologies

As explained in section 2.0, the system as it was initially deployed in Eletrosul used a viewing software to remotely access the data. This viewing software had to be installed in each user’s remote computer.

This solution, while functionally perfect, was inconvenient in some aspects, such as limiting access to the system to previously prepared computers, the waste of computer engineer time to install the viewing software for the users and also to download the necessary updates.

To avoid these inconveniences, and in line with the most modern cloud-computing trends, in which the applications are executed only in remote servers, using as local interface only the internet browser, the Sigma monitoring interface has been updated to use the so called Web 2.0 technologies.

Thus, there is no longer need to install specific software on users’ computers; the users now use only their internet browser. Therefore, any upgrades to the system are restricted to the monitoring servers, and do not affect the user computers. The access to the system is possible from any computer in the Eletrosul Intranet, as long as the user has a user ID and a password.

System access security can be preserved through the cryptographed connection protocol HTTPS, in addition to the login and password to access the system.

3.5 - Wireless communication with the sensors

In order to reduce the cost and facilitate the installation of monitoring systems, the feasibility of using wireless communications between sensors on the transformer and the substation control room has been verified by a pilot in Santo Ângelo substation, at the time the system was installed in a transformer bank, using the Wi-fi standard.  Gas sensors which were already in place were integrated as well as new bushing capacitance and tangent delta monitors.  Data are directly transmitted to a router connected to the corporate network and acquired by the Sigma 4 software.

The application performance proved entirely satisfactory, demonstrating the feasibility of this technology with great potential to reduce costs and installation time.

3.6 - Adding an Engineering Model

The open and modular architecture of the monitoring system has also allowed the inclusion of a new engineering item for loading simuation. The simulation is possible in two ways:

  • Based on current load conditions at ambient temperature, with the user inserting the new hypothetical loading value;
  • Based on hypothetical load evolution curves and ambient temperature in 24 hours.

In both modes the user can see the consequences of hypothetical situations in terms of temperatures reached and loss of life related, and can compare the maximum temperature that would be achieved with the temperature of bubble formation due to moisture, also calculated by the monitoring software. In all simulations, the user can modify the cooling command mode (automatic or manual) and the enabling temperatures, as well as the cooling hysteresis.

3.7 - Connectivity to other systems

The evolution of the Sigma monitoring systems has provided them with a capability to exchange data with other Eletrosul systems, such as the SAGE supervising system.

This connectivity is possible through different methods, selected according to the need and convenience of the application. Examples of possibilities are SQL databases or, in other standards, OPC, web services, open communication protocols (eg Modbus, DNP 3.0, TCP / IP), among others.

4.0 - RESULTS

The use of automated online monitoring of transformers and reactors has several features that may be beneficial for the maintenance of that kind of equipment, such as reducing risk of catastrophic failure, controlling and extending service life, migrating from preventive to predictive maintenance, with the consequent increase in the availability of the equipment and reduction of the costs due to lack of equipment availablity, among others.

However, the monitoring system is presented as a useful tool not only for maintenance engineering but also for the operation and planning, due to loading simulation and prediction of future temperature as a function of current load, associated with equipment status diagnoses, which provide an indication of the risk to use overloaded equipment, for example.

Another example of the usefulness of the monitoring system could be observed when a 245 kV bushing failed in the Santo Ângelo substation. In this case, the evolution of the bushing defect was extremely fast, leaving no time to remove it from operation before failure, unlike what is normally expected for defects in bushings [6]. However, the presence of the monitoring system with the storage of measurements in databases allowed further analysis of the occurrence, leading to conclusions that would be impossible without the monitoring system – like the fact that the defect evolved very quickly.

Therefore, the monitoring system allowed the technicians to deepen their knowledge about the evolution of this type of defect and to improve the system itself and the procedures when this kind of defect takes place.

5.0 - CONCLUSIONS

This paper has presented the history of installation, expansion, customization and operation of the Sigma monitoring systems in Eletrobras Eletrosul, as well as the evolution of this system over time, including the architectures used to install sensors on the equipment, data output architectures, communication media and user interfaces.

The results obtained were presented as well as the benefits gained with the developments and improvements of the system over time, mostly allowed by Sigma’s open, decentralized and modular architecture.

Considering the importance of transformers and reactors in the Eletrosul park for the SIN, the installation of the online monitoring system for that equipment, as well as the possibility of the system evolution and of its uses over time is of great significance to increase the electric power system reliability and the supply continuity, in addition to contributing to cost reductions that help to reduce rates.

6.0 - REFERENCES

  1. Amom, Jorge, Alves, Marcos, Vita, André, Kastrup Filho, Oscar, Ribeiro, Adolfo, et. al., “Sistema de Diagnósticos para o Monitoramento de Subestações de Alta Tensão e o Gerenciamento das Atividades de Manutenção: Integração e Aplicações”, X ERLAC – Encontro Regional Latinoamericano do CIGRÉ, Puerto Iguazu, Argentina, 2003.
  2. Alves, Marcos, “Sistema de Monitoração On-Line de Transformadores de Potência”, Revista Eletricidade Moderna, Maio/2004.
  3. Alves, Marcos, “Field Experience with On-Line Monitoring of Two 150MVA 230kV Transformers with On-Load Tap Changers”, Cigre SC A3 International Technical Colloquium, September/2007.
  4. Vasconcellos, M. Alves, “Especificação de Sistemas de Monitoração On-line para Transformadores de Potência Baseados em uma Arquitetura Descentralizada”, V Workspot, Brasil, Abril 2008.
  5. Lavieri Jr., Arthur, Hering, Ricardo, “Novos Conceitos em Sistemas de Energia de Alta Confiabilidade”, Encarte Especial Siemens Energia, http:// mediaibox.siemens.com.br/upfiles/232.pdf, Janeiro/2001.
  6. Melo, Marcos A. C., Alves, Marcos, “Experiência com Monitoração On-Line de Capacitância e Tangente Delta de Buchas Condensivas”, XIX SNPTEE – Seminário Nacional de Produção e Transmissão de Energia Elétrica. Rio de Janeiro, Brasil, 2007.

Treetech Tecnologia

Rua José Alvim, 112  |  Atibaia–SP  |  12940–750

tel. +55 (11) 2410 1190

cel. +55 (11) 98775 0708

Back To Top