Skip to content
Smart Solutions for Smart Grids

SPS – Parallelism Supervisor

Commands the parallelism between two or more power transformers (keeping the philosophy Master-Slave) and indicates the switching position of the OLTC. Maintains the same position in all the transformers and avoid a current flow between the windings in parallel.

Treetech Tecnologia

Rua José Alvim, 112  |  Atibaia–SP  |  12940–750

tel. +55 (11) 2410 1190

cel. +55 (11) 98775 0708

Back To Top