{"id":8399,"date":"2006-05-10T16:09:17","date_gmt":"2006-05-10T19:09:17","guid":{"rendered":"http:\/\/treetech.com.br\/articles\/others\/eletrosul-se-campos-novos-sistema-de-monitoramento-de-2-bancos-525kv"},"modified":"2017-07-31T22:06:19","modified_gmt":"2017-08-01T01:06:19","slug":"eletrosul-ss-campos-novos-2-525kv-banks-monitoring-system","status":"publish","type":"post","link":"https:\/\/treetech.com.br\/en\/eletrosul-ss-campos-novos-2-525kv-banks-monitoring-system\/","title":{"rendered":"Eletrosul SS Campos Novos \u2013 2 525kV Banks Monitoring System"},"content":{"rendered":"<div class=\"wpb-content-wrapper\">[vc_row][vc_column width=&#8221;1\/4&#8243;]<div class=\"vcex-spacing wpex-w-100 wpex-clear\"><\/div>[vc_single_image image=&#8221;8397&#8243; alignment=&#8221;center&#8221; onclick=&#8221;img_link_large&#8221;][\/vc_column][vc_column width=&#8221;3\/4&#8243;][vc_column_text]Eletrosul Centrais El\u00e9tricas do Sul do Brasil, expanded Campos Novos substation making it the most important one strategically for the Southern region of the Country. This expansion provides further flexibility and operational safety, improving the energetic quality and optimizing the energy flow between Southern and Southeastern regions.<\/p>\n<p>Campos Novos substation is largely important for the energetic supplying of Rio Grande do Sul state and Western region of the state of Santa Catarina, due to its strategic location in the Midwestern region of Santa Catarina, and by the interconnection of that state to Rio Igua\u00e7u generating park through transmission lines at 525kV class. This substation is in charge of the flowing of the electric power generated by Hydro-Electric Power Plants of Campos Novos and Barra Grande.<\/p>\n<p>The expansion adds new transformers banks, 525\/230 kV, 672 MVA (3&#215;224). This equipment was provided by the company Areva T&amp;D, traditional transformers manufacturer with headquarters in the state of SP and RS. The first bank of transformers started operation in December, 2006. However, the second bank started operating in March, 2007, replacing an old bank and doubling the installed power.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;2\/3&#8243;]<div class=\"vcex-spacing wpex-w-100 wpex-clear\" style=\"height:10px;\"><\/div>[vc_column_text]Treetech Sistemas Digitais provided to Eletrosul, through Areva, a monitoring system able to monitor six new machines. This system currently integrates temperature, moisture, gases, charging and\u00a0 switching information, besides monitoring the transformer\u2019s protections, such as Buchholz and membrane relays, and other signs of warnings and shut-downs.<\/p>\n<p>The system runs in a server at the control room, and it is interconnected to the field through optical fiber, electrically isolating the system from the equipment installed close to the transformer. All the system\u2019s information are available at Electrosul Intranet, and they can be remotely verified from anywhere within the company\u2019s facilities.[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;5696&#8243; img_size=&#8221;medium&#8221; alignment=&#8221;none&#8221; img_link_large=&#8221;yes&#8221;][\/vc_column][\/vc_row][vc_row][vc_column]<div class=\"vcex-spacing wpex-w-100 wpex-clear\" style=\"height:10px;\"><\/div>[vc_column_text]Trainings were applied to Electrosul\u2019s representatives on the monitoring system. Initially, a theoretical training was provided at Areva\u2019s facilities, in the city of Canoas. After the conclusion of the system\u2019 start up works, other training was performed on the operation and functionalities of the IEDs and System, performed at the Campos Novos substation itself, being able to directly interact with the equipment installed at the SS.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column]<div class=\"vcex-spacing wpex-w-100 wpex-clear\" style=\"height:20px;\"><\/div>[vc_column_text]<span style=\"font-size: 24px;\"><strong>Scope of the Supplying to Electrosul, Campos Novos SE, through Areva:<\/strong><\/span>[\/vc_column_text]<div class=\"vcex-spacing wpex-w-100 wpex-clear\" style=\"height:20px;\"><\/div>[\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/3&#8243;][vc_column_text]<strong>1 &#8211; Sensors (IED) integrated to the Monitoring System:<\/strong><\/p>\n<ul>\n<li>Temperature Monitors, TM1 and TM2;<\/li>\n<li>Temperature Monitor, DTM;<\/li>\n<li>Voltage Regulation Relays, AVR;<\/li>\n<li>Bushing Monitors, BM;<\/li>\n<li>Moisture Monitors, MO;<\/li>\n<li>Membrane Breach Relay, MBR;<\/li>\n<li>Data acquisition and DM control modules for remote monitoring of the contacts status.<\/li>\n<\/ul>\n[\/vc_column_text]<div class=\"vcex-spacing wpex-w-100 wpex-clear\" style=\"height:20px;\"><\/div>[\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text]<strong>2 &#8211; Sigma Monitoring Software for the transformers:<\/strong><\/p>\n<ul>\n<li>Digitalization of the main measurements of the sensors installed at the transformer;<\/li>\n<li>Refrigeration Maintenance Module;<\/li>\n<li>OLTC Maintenance Module;<\/li>\n<li>Insulation Aging Module;<\/li>\n<li>Final Gradient Module;<\/li>\n<li>Chromatography Module;<\/li>\n<li>Physical-Chemical Essay Module;<\/li>\n<li>Refrigeration Efficiency Module;<\/li>\n<li>Temperature Differential Module;<\/li>\n<li>Motor Torque Module;<\/li>\n<li>Paper Moisturizing Module;<\/li>\n<li>OLTC Moisturizing Module;<\/li>\n<\/ul>\n[\/vc_column_text]<div class=\"vcex-spacing wpex-w-100 wpex-clear\" style=\"height:20px;\"><\/div>[\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text]<strong>3 &#8211; Services:<\/strong><\/p>\n<ul>\n<li>Follow-up (commissioning) of the IEDs facilities and interconnections necessary for the operation of the Monitoring System;<\/li>\n<li>Server\u2019s installation and configuration;<\/li>\n<li>Software\u2019s installation and configuration;<\/li>\n<li>Inspection Plan and Tests during the system\u2019s implantation;<\/li>\n<li>Training on software operation for Electrosul\u2019s representatives.<\/li>\n<\/ul>\n[\/vc_column_text]<div class=\"vcex-spacing wpex-w-100 wpex-clear\" style=\"height:20px;\"><\/div>[\/vc_column][\/vc_row][vc_row][vc_column]<div class=\"vcex-module vcex-divider vcex-divider-solid vcex-divider-center wpex-mx-auto wpex-block wpex-h-0 wpex-border-b wpex-border-solid wpex-border-main\"><\/div>[vc_column_text]<span style=\"color: #008000; font-size: 18px;\"><strong>Project\u2019s Highlights:<\/strong><\/span><\/p>\n<p>The system is under continuous operation since December, 2006.[\/vc_column_text][\/vc_column][\/vc_row]\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=&#8221;1\/4&#8243;][vc_single_image image=&#8221;8397&#8243; alignment=&#8221;center&#8221; onclick=&#8221;img_link_large&#8221;][\/vc_column][vc_column width=&#8221;3\/4&#8243;][vc_column_text]Eletrosul Centrais El\u00e9tricas do Sul do Brasil, expanded Campos Novos substation making it the most important one strategically for the Southern region of the Country. This expansion provides further flexibility and operational safety, improving the energetic quality and optimizing the energy flow between Southern and Southeastern regions. Campos Novos substation&hellip;<\/p>\n","protected":false},"author":1,"featured_media":5695,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130],"tags":[],"class_list":["post-8399","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cases-en","entry","has-media"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/treetech.com.br\/en\/wp-json\/wp\/v2\/posts\/8399","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/treetech.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/treetech.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/treetech.com.br\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/treetech.com.br\/en\/wp-json\/wp\/v2\/comments?post=8399"}],"version-history":[{"count":0,"href":"https:\/\/treetech.com.br\/en\/wp-json\/wp\/v2\/posts\/8399\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/treetech.com.br\/en\/wp-json\/wp\/v2\/media\/5695"}],"wp:attachment":[{"href":"https:\/\/treetech.com.br\/en\/wp-json\/wp\/v2\/media?parent=8399"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/treetech.com.br\/en\/wp-json\/wp\/v2\/categories?post=8399"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/treetech.com.br\/en\/wp-json\/wp\/v2\/tags?post=8399"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}