Skip to content
Smart Solutions for Smart Grids

SPS – Parallelism Supervisor

Commands the parallelism between two or more power transformers (keeping the philosophy Master-Slave) and indicates the switching position of the OLTC. Maintains the same position in all the transformers and avoid a current flow between the windings in parallel.

Treetech Tecnologia
Rua José Alvim 112
Atibaia – SP
Cep 12940–750

Tel +55 (11) 2410 1190

Cel +55 (11) 98775 0708

OUTLET

Back To Top